Here are a few photos to illustrate different aspects of pond dam's components, construction and maintenance.

Completed Pond
Established Pond

Core Trench
Core Trench

Fill Core Trench With Clay
Core Trench Being
Packed Back With Clay

Anti-Seep Collars
Pipe With
Anti-Seep Collars

Pipe With Rubber Joints
PVC Plastic Pipe
With Heavy Duty Seal
And Joint

Canopy Inlet Design
Canopy Inlet Design

Newly Completed Dam
Top Soil Is Spread On Top
In Order To Grow A
Good Grass Cover

Pipe Replacement
When A Pipe Is
Replaced The Whole
Dam Is Split Open

Pipe Wash Out
Lack Of Anti-Seep Collars
Is Cause Of This
Pipe Wash Out

Vegetation Problem
Vegetation Problem

Sedimentation Problem
Sedimentation Problem

Livestock
Good Vegetation Must
Be Maintained On Dam
Livestock Access Controlled